July 1998

Website 02 12 20

Flood prevention scheme for NOSWA (North of Scotland Water Authority) at the Haughs, Turriff. 1500 and 900 diam pipework laid in some fairly atrocious ground conditions. The Ackerman EC230B was probably 3 years old in these photos but still a very capable machine. The Weldex crawler crane was the only way to rehandle the pipework from delivery vehicle to trackside on this site.